6ft Marble Mountment Wind Load

Take a look at our sale going on now.
6ft marble mountment wind load. If you have ever considered the need for a monument lifting device this is a great time to buy. Structural concrete work is planned to bear loads or hold weight but transfer the weight to the soil base beneath the structure. 245 mph wind no delamination or disengagement. Tested to pressures in excess of 180 psf.
In order for a structure to be sound and secure the foundation roof and walls must be strong and wind resistant. Positive and negative wind loads. When building a structure it is important to calculate wind load to ensure that the structure can withstand high winds especially if the building is located in an area known for inclement weather. This monument was sunk over 5 inches into the ground and in less than 30 minutes was level and secure for years to come.
Pick up your own tombstone jack tm and make your life just that much better. Just dig two holes about 2 feet deep lower the posts attached to the sign level and align the monument to vertical and fill with concrete. Our made in the usa lift slings are manufactured from heavy duty material treated to improve abrasion resistance and reduce wear even in the most rigorous lifting applications. 272psi 39 168 psf stone splitting indicating adhesive bond strength greater than the stone strength for marble 333psi 47 952psf for granite.
The thickness of concrete is an important factor in load bearing strength but to conserve resources and avoid over building other factors are also taken into consideration. Asce 7 98 results vary based on height location etc. The confederate monument located on the county side of the park was built in 1880 15 years after the civil war and is the oldest monument in memorial park. The lifting strap experts us cargo control is a trusted expert in the nylon lifting slings industry.